This OCHA Special Focus covers the planning and zoning regime applied by the Israeli authorities in Area C of the West Bank. Under this regime, Palestinian construction is effectively prohibited in some 70 percent of Area C, while in the remaining 30 percent, a range of restrictions virtually eliminate the possibility of obtaining a building permit. In practice, the Israeli authorities generally allow Palestinian construction only within the boundaries of an Israeli-approved plan and these cover less than one percent of Area C, much of which is already built-up. As a result, Palestinians are left with no choice but to build "illegally" and risk demolition of their structures and displacement. The consequences of the current regime are wide-ranging and extend to the entire Palestinian population of the West Bank.
באתר זה, התוכן המופיע בשפה העברית תורגם מאנגלית, ונעשו מאמצים להבטיח את דיוק התרגום. כיוון שעדיין ייתכנו שגיאות, מומלץ לעיין בגרסה המקורית באנגלית בכל מקרה של ספק.